Slope Downtube Set
sku:
RM72.90
Color
: Transparent
![](http://anbotstore.com/cdn/shop/products/Untitled-design-2_9975f972-a4d8-4b7e-b05a-6d174fc89597_small.jpg?v=1652940797)
![](http://anbotstore.com/cdn/shop/products/Set-Combo-3_small.jpg?v=1652940797)
Free Shipping
Min spend RM100 Get Free Shipping
DISCOUNT CODE : SUMMER25
Min Spend RM200 get RM25 OFF July Only!
DISCOUNT CODE : SUMMER45
Min Spend RM400 get RM45 OFF July Only!
Quantity
All 4 Slope Downtube Set: Transparent items are already added to cart!
Description
Product Specification :
Available in black & transparent
-Mtb road bike bicycle frame protector downtube
-Get 2 layers of downtube protection, it can be attached under a bicycle frame close to the crank (to protect from rock) & the lower end is parallel to the fork, which is commonly used while the bike is loading.
-3m strong adhesive sticky adhesive
– It can be used in all kinds of mtb bikes.
-Very useful bicycle frame body protection
-Weight : 0.2kg
How to install :
1. Clean the frame to be attached to the Downtube Guard / Chainstay Guard, Make sure there are no traces of dirt /oil stuck to it.
2. For the installation of chainstay guard, measure and adjust first to frame.
3. Remove the 3M adhesive then attach the Downtube Guard / Chainstay Guard on the frame, press and glue it carefully.
4. Make sure the Downtube Guard / Chainstay Guard is evenly and perfectly attached.
5. After the Downtube Guard / Chainstay Guard has been attached, it should be wrapped with masking tape that has been provided.
6. Wait for 6-8 hours for 3M to perfectly glue.
Available in black & transparent
-Mtb road bike bicycle frame protector downtube
-Get 2 layers of downtube protection, it can be attached under a bicycle frame close to the crank (to protect from rock) & the lower end is parallel to the fork, which is commonly used while the bike is loading.
-3m strong adhesive sticky adhesive
– It can be used in all kinds of mtb bikes.
-Very useful bicycle frame body protection
-Weight : 0.2kg
How to install :
1. Clean the frame to be attached to the Downtube Guard / Chainstay Guard, Make sure there are no traces of dirt /oil stuck to it.
2. For the installation of chainstay guard, measure and adjust first to frame.
3. Remove the 3M adhesive then attach the Downtube Guard / Chainstay Guard on the frame, press and glue it carefully.
4. Make sure the Downtube Guard / Chainstay Guard is evenly and perfectly attached.
5. After the Downtube Guard / Chainstay Guard has been attached, it should be wrapped with masking tape that has been provided.
6. Wait for 6-8 hours for 3M to perfectly glue.
We also recommend
Combine your style with these products